Six ways switchgear comes out of a building
Most of the gear we buy is released by one of six events. Each one has a different clock, a different set of people to coordinate with, and a different way to lose money if the electrical scope is handled last instead of first.
A permanent plant closure is a race against the demolition contractor. A live facility upgrade is a cutover where the old lineup sits on the critical path for the new one. A demolition contractor is selling equipment that would otherwise be priced as metal in their own bid. An electrical contractor is freeing up working capital and warehouse racks. A utility is working through an internal surplus declaration process. A property owner is discovering that the existing service is oversized and wrong for the building's next use.
What does not change
In every one of these situations we do the same things: we take title to the equipment, we bring our own riggers and trucks, we cover freight, and we pay upfront before the load leaves the property. The gear has to be de-energized, isolated and locked out by your electrician or the utility before our crew touches it. We do not perform energized work, utility switching or abatement.
What changes is the sequencing and the paperwork, which is what the pages below are about.

Choose your situation
Plant closure
A permanent facility shutdown requires careful coordination of asset disposition, temporary power, and final demolition. Extracting the maxi…
Facility upgrade
Upgrading your electrical distribution system requires precise coordination to keep your facility running. We purchase your outgoing switchg…
Demolition contractors
The electrical infrastructure inside a building slated for demolition holds significant value beyond its base metal weight. We purchase used…
Electrical contractors
Electrical contractors often accumulate surplus switchgear from cancelled projects, change orders, and strategic over-ordering. We purchase …
Utilities and co-ops
Utilities, rural electric cooperatives, and municipal power systems regularly cycle out station-class electrical equipment due to capacity u…
Property redevelopment
Repositioning an industrial or commercial building often means the existing electrical distribution is vastly oversized for its new purpose.…
Ready to move it out?
Send a photo of the nameplate showing the manufacturer, type, voltage class and bus rating, a photo of the full lineup, and a note about how the room is accessed. Call (954) 740-1983 or email electricalequipmentbuyers@gmail.com and we will come back with an itemized offer.